the delaware riverkeeper opines on bishop tube to east whiteland zoning hearing board

In advance of the East Whiteland Zoning Hearing Board hearing continuation which will occur on Wednesday, March 15, 2017 at 7:15 PM at East Whiteland Township 209 Conestoga Road, Frazer, PA 19355 unless it gets rescheduled due to weather please see letter sent to the Zoning Hearing Board – YES that is a year typo in the letter, it happens. (Also read about Bishop Tube on Delaware Riverkeeper website HERE)

East Whiteland residents are so incredibly fortunate that Maya the Delaware Riverkeeper has taken an interest here (letter uploaded here to this website Delaware Riverkeeper Network ZHB letter 3.15.17 DRN comment with Attachments ).

Don’t just take my word, or the word of in many cases ill former Bishop Tube workers or General Warren Village residents, take the word of EXPERTS.

Bishop Tube is a site that could be redeveloped, but in my personal opinion with much less density AND after serious not minimal remediation, but again why not check with experts who are obviously concerned with this? Read what the expert says in the letter above…

Hey media, what are you waiting for?  Maybe you all can get the DEP to come out of the shadows here? I still do not understand what it is they have actually done and what they are supposed to do? And why hasn’t more clean up been done since they announced they were watching it? Isn’t that like the DEP is looking the either way?

And again…..just so we are clear – I am not adverse to the site being developed with following caveats: (1) much less density and preferably a different and non-residential use (2) AFTER a lot more remediation than has been discussed – as in not just the soil being removed and replaced but dealing with the groundwater issues, right?

Also, for once the residents of General Warren should be taken into consideration, shouldn’t they? And the potential health, safety, and welfare of potential future residents?

One General Warren resident said the other day:

Just hiked the stream between Bishop Tube and General Warren Village. Our township officials need to go back and seriously look at what they are considering before approving.
All the promises by the township that Village Way will be nothing more than “emergency access” are likely alternative facts. Not like a bed of stone will be laid to provide this access. They will build a bridge. I really do not believe that type of investment will be made and not used.  Maybe the township needs to consider access coming off of Three Tun Rd and coming in behind the oil company. The train bridge going into BT is posted 12’10” built in 1915 and visually crumbling. I can’t imaging how they will get in the equipment to tear down BT under that bridge or any other large construction equipment. Sure 2 vehicles can pass under this bridge but what about the 500/600 people who end up living back in there, how will they walk to the Giant? I didn’t measure but I can’t imaging a sidewalk under the bridge. Build your development and keep the Village out of it. Stop the bridge into Village Way.

Someone responded to that resident with:

What also cracks me up, because you know this won’t be in the brochure, I read in some document they are planning to put some type of vapor chimney in the units. Not for our common Radon issue, but for any other vapor release from the chemicals left in the ground at Bishop Tube. WTH???

Another resident said elsewhere:

We need it cleaned up right before building starts and that includes the groundwater below where the TCE now is !

There has also been a lot of chatter about the developer leaving if they do not get zoning variance but does zoning variance get groundwater remediation, etc???  I think the developer will get the variance in the end.  I see it getting set up for a softball in the meeting replay of the recent supervisors’ meeting.  But when Bill Holmes said it isn’t the end of it, he is right BUT residents with standing (General Warren) have to keep going to meetings because that is HOW you will get the site cleaned and get DEP to move.

I have to be honest that while I have issues with the developer and serious issues with the density of the development plan (even if it wasn’t being built on a toxic waste dump of a land parcel), where the issues never abate and concerns continue to grow is with the Pennsylvania DEP.  They are the constant from day 1 with Bishop Tube. So that being said, residents need to go to meetings and call the DEP (717) 783-2300 is the main number in Harrisburg.    (484) 250-5900 is the number to the Southeast regional office in Norristown.  And keep calling State Senator Dinniman’s and State Rep Duane Milne’s offices too.

WATCH THE EAST WHITELAND MEETING – [CLICK HERE]  Start watching somewhere around 20 minutes in. Are supervisors prepared to cave no matter what the risks to current and future residents? And DEP? Where is the DEP…..thank goodness for Environmental Action Committee because they at least seem to be in the residents’ corner, right? Seriously, does East Whiteland need Erin Brocavitch?

The PA DEP seems to say a lot about what they will not do, but I ask about what they should have been doing all along?  Anderson Hartzell is the acting director of PA DEP in our area now, but no one has ever clarified the rather mysterious and abrupt departure of Cosmo Servidio in the fall?  And remember how Limerick residents complained about the PA DEP being slow to act in 2010?

Limerick residents blast DEP for slow action against pollution (Video)

By Evan Brandt, The Mercury POSTED: 05/17/10, 12:01 AM EDT|UPD

LIMERICK – Residents of more than 45 homes whose wells have been polluted by twin underground plumes of pollution packed the township meeting room to hear how the state is handling the crisis.

Residents complained about the slow pace of the Pennsylvania Department of Environmental Protection in dealing with the pollution problem that was detected as early as the 1980s and more recently in 2002.

To date, wells tested at 47 homes have been found to have chemical contamination. The homes are in the vicinity of South Limerick Road, Springford Road and West Linfield-Trappe Road….

Last week, The Mercury reported that another groundwater contamination site has been identified by the DEP. Called the Landis Creek Site, the contamination has been found in eight wells near the intersections of Country Club Road and Ridge Pike and Township Line Road and Graterford Road.

The contaminant at the Landis Creek Site is trichloroethylene, or TCE, which is recognized as a carcinogen in California and considered a potential carcinogen by several federal agencies, including the EPA.

Now in Missouri in 2016 a company was awarded $20 million “for exposing a 27-year-old woman to a toxic chemical that has left her with permanent disabilities, according to online court records….At age 14 in 2002, Kirk was diagnosed with autoimmune hepatitis. Testimony at the trial revealed that the disease was caused by trichlorethylene, also known as TCE. The chemical, a known carcinogen, was used by the manufacturer of ball bearings to clean metal parts.”

TCE is what everyone is talking about at Bishop Tube.  As per a lawyer in Nebraska’s website:

People who have worked in degreasing operations have the highest risk of exposure to TCE. Exposure to the chemical can happen by breathing, touching, or drinking/eating. People who use TCE as a solvent may breathe significant amounts of the compound. Since TCE evaporates quickly, people who shower or bath in contaminated water may breathe the vapors, as well. TCE can be absorbed through the skin. Individuals who don’t use solvent-resistant gloves while using the compound may face exposure. Groundwater can be contaminated once TCE is released into the soil, thus anybody who drinks from a well may be exposed.

Unfortunately many industrial companies use and have used Trichloroethylene for decades without properly supplying their employees with proper education about the chemical or proper safety training or protective measures to prevent all the devastating problems associated with Trichloroethylene exposure.

Potential Health Effects of TCE

Some health effects may occur immediately or shortly after inhaling air that contains more than 50,000 parts per billion by volume of Trichloroethylene. These include:

  • Heart problems including cardiac arrhythmias;
  • Serious liver injury;
  • Nausea and vomiting;
  • Eye, nose and throat irritation.
  • Dizziness, headache, neurological problems; and

Although TCE has not been specifically linked to certain effects in humans, studies have shown that animals exposed to high levels of the compound may develop problems such as:

  • Cancer (including liver, kidney, lung, brain, soft tissue, testicular tumors, and leukemia)
  • Heart defects in offspring when mother was exposed to TCE
  • Increased risk of Parkinson’s Disease (six times greater than that of non-exposed subject)

Read an old article from 1989 from the Washington Post called Forging a Covenant of Silence . Here is an excerpt:

WEBSTER, N.Y. — There are three vacant houses on the 600 block of Salt Road in this community east of Rochester, and those who live on the street wonder why their neighbors moved out and no one else has moved in. “All of a sudden I saw a moving van moving one family out,” said Ray Gerber, who lives several hundred feet north of the cluster of empty houses, now owned by Xerox Corp. “I worry about it.” “We’re in the dark,” said Grace Krasucki, another Salt Road resident. The empty houses — the result of a secret and costly legal battle — stand as a testament to the growing use of secrecy procedures in the nation’s civil courts and how that secrecy is hampering efforts by scientists and health officials to learn more about hazardous chemicals and their effects….In the fall of 1984, construction workers at the Xerox complex discovered discolored water during excavation. Xerox later learned that 63 pounds of trichloroethylene (known as TCE), a solvent used in cleaning and lubricating machinery, had leaked over a period of years from four underground storage tanks…. In addition to faulting Xerox for the TCE contamination, attorneys for the families alleged that their clients’ health had been affected by airborne emissions from the plant. According to sources familiar with the case, tests in the houses showed traces of a TCE derivative in the basements and the sump pumps. They also showed residues of two other toxic chemicals, styrene and selenium, in the soot that coated lawn furniture, the walls of their homes and their car windows.

 

I would be curious if the builder on this (Benson) actually has brownfield development experience? And wow check out the Google reviews.  Not positive but then again these are the people who said let us build townhouses behind Linden Hall and we will restore Linden Hall, right? And what happened?  Sold the land with approved plans and Linden Hall just sits and continues to rot, right? And then there is that whole thing brewing in Tredyffrin about Howellville, right? And the whole Kimberton Meadows saga which seems to persist?

Here – Kimberton Meadows saga worth reading about if they are slated to be builders of Bishop Tube’s new lemming village:

East Pikeland Township Board of Supervisors Meeting February 3, 2015

East Pikeland Township Board of Supervisors Meeting March 1, 2016

East Pikeland Township Board of Supervisors Meeting April 5, 2016

Kimberton Meadows Residents Go Before Board Again

The group of homeowners says the development is not moving forward.

By September 13, 2011 1:22 pm ET

Residents are begging the  East Whiteland supervisors for help.  But why is a steep slopes variance for a cram plan the only solution? The groundwater. How will the development address that? How does East Whiteland know for sure what TCE will do?  The answer is they do not. East Whiteland your obligation is to your residents FIRST.  

Here is an excerpt from the letter sent by the Delaware Riverkeeper that stands out:

….As you know, the intent of the sleep slope protections identified in § 200-57 “is to protect hillsides and their related soil and vegetative resources, thereby minimizing adverse environmental effects” including providing protection from “inappropriate development, such as excessive grading, landform alteration, and extensive vegetation removal”, “[a]voidance of potential hazards to life and property and the disruption of ecological balance that may be caused by increased runoff, flooding, soil, erosion and sedimentation, blasting and ripping of rock, and landslide and soil failure,” “[p]rotection of the entire Township from uses of land that may result in subsequent expenditures for public works and disaster relief and adversely affect the economic well-being of the Township,” “[e]ncouragement of the use of steep and very steep slopes for open space and other uses that are compatible with the conservation and protection of natural resources.”

Granting a variance to Constitution Drive Partners from the steep slow variance would undermine all of these goals. The site is significantly contaminated and borders Little Valley Creek, tributary to Valley Creek, an exceptional value stream. The Delaware Riverkeeper Network is concerned that the level of land disturbance proposed, including on the steep slopes for which variance is sought, on this site given the high level of continuing contamination, poses both health risks and will result in ecological damage, including to the Little Valley Creek, will result in future costs to the township to respond to the degradation, and is not otherwise compatible with conservation.

As discussed by Dr. Tom Myers in the attached report:

“Developing this site would expose the existing contamination to wind and rain which would cause it to erode and pass downstream or downwind where it would contaminate additional areas. Also, much of the contamination would remain in place, especially in groundwater and soils outside of the targeted excavation zone. Other than the additional contamination caused by water and wind erosion, this residential development and remediation will expose substantial amounts of contamination that would be left in place to increased erosion. The development would not contribute substantially to the necessary remediation of downstream and downgradient resources.”

Constitution Drive Partners wants to do a partial cleanup so it can develop the property, make lots of money, and walk away. Leaving dangerous amounts of contamination still at the site to contaminate groundwater, Little Valley Creek, Valley Creek, and any communities that are on the receiving end of that contamination as it makes its way to soil, air and water.

Constitution Driver Partner’s responses to DEP questions and concerns regarding their proposal demonstrates a disregard for the environment that is troubling, to say the least.

 

calling erin brockovich?

Now that got your attention, didn’t it? Calling Erin Brockovich?

Is that what Bishop Tube needs to get to the truth of that site?

I am waiting to see the meeting recording and for those in attendance to send me notes, but here are the comments of someone who was there, someone who spoke, and most importantly? Someone who worked there.

You see the people who worked there literally know where the proverbial, in this case chemical, bodies are buried.  They also say dead men tell no tales except people talk about all of the time what happened to people who worked at Bishop Tube, lived next to Bishop Tube, worked around the TCE and whatever else at Bishop Tube, right?

So here, read these words. They are not my words. They are a powerful first hand account- when East Whiteland posts their meeting video (here is the channel of past meetings) it will be added to the post so it is irrefutable. This is also one of the people who has spoken to the media before – and who is extensively quoted in that Daily Local article written by Anne Pickering in 2007:


These gentlemen who worked at Bishop Tube have spoken their same truth consistently for years so I do not get how people have never heard about the above until last night?  I spoke to one of the gentlemen yesterday and he’s sick. Bishop Tube poisoned these guys, so to me, if I was an elected official or some big mahatma with the Pennsylvania DEP, I would listen and act, but have they? Will they? Shouldn’t they?

So, if the developer can’t get what he wants (variance) he will pick up his proverbial ball and head back home on the Main Line or whatever? Is that what I am understanding? Even though when he bought the land circa 2005 he agreed to clean it up jointly with the PA DEP?

Allow me to quote (again) one of the more comprehensive articles ever written about the site that was in the Daily Local about the deadly history of Bishop Tube:

In 2005, Brian O’Neill of O’Neill Property Group purchased the site for $700,000 through his affiliate, Constitution Drive Partners, and signed an agreement with the state Department of Environmental Protection (DEP) to jointly clean it up. The plan is to keep the buildings and convert it for light industrial use.

I also have questions about the state of the art vapor mitigation system which people at the East Whiteland meeting were told last night remediated all that developer was required to do? Is this the air something (can’t remember the word) system that was designed by a company in Chadds Ford? The piece of equipment that someone said is broken and hasn’t worked in like 3 or 4 years? Is this what the DEP told the developer to do – to stop, they had done their part and the DEP was then supposed to come onsite to do more remediation only they never did?

I think this is related to an article I found from July 2014 that sometimes only shows up on a web cache:

Pa. Court Says Landowner Can’t Appeal DEP Agreement’s End

Law360, Philadelphia (July 18, 2014, 5:09 PM EDT) — A Pennsylvania court ruled Thursday that the owner of a contaminated tract of Chester County land could not appeal a Department of Environmental Protection letter ending an agreement in which the landowner agreed to take measures to rehabilitate the site in exchange for protection from liability.

The Pennsylvania Environmental Hearing Board said that the letter the DEP sent to Constitution Drive Partners LP — which purchased the site of a former precious metals and steel processing facility in 2005 — was not appealable because the letter itself had no effect on the company….When CDP bought the former Bishop Tube site in East Whiteland Township, it reached an agreement with DEP to take certain steps to remediate the existing soil and groundwater contamination, according to the opinion.

Then, in 2011, an independent contractor hired by CDP damaged piping and protective covering on a soil vapor extraction and air sparging system while conducting salvage operations on the site.

According to the opinion, CDP said that DEP had agreed that the repairs could be delayed until DEP was prepared to operate the system or the company intended to start redevelopment work on the site.

But in January, DEP sent the company the letter citing the 2011 damage and accusing the company of breaking the 2005 agreement.

And I found the The Pennsylvania Environmental Hearing Board docket sheet on the case, as well as final opinion and order which I downloaded (and uploaded here: Case Number 2014019)

Maybe I am just a simple person and I don’t get it.  But what I don’t get is how so many people seem to know how deadly the toxic Bishop Tube site is? Is it the township doesn’t have to know where all of the contamination points are because that is the responsibility of the builder and/or developer? But what I don’t get about that is if the township is approving plans, aren’t they supposed to know all of these details to make the most educated decision possible?  After all don’t taxpayers pay for the experts and solicitors to in fact know all of this?

What happens here if the remediation is not right? In addition to health, safety, and welfare down the road, what about the economic impact? As in future litigation on a toxic site that could bankrupt a small township?

Where oh where is the Pennsylvania Department of Environmental Protection in all of this?  The good old PA DEP with the following mission statement right off their website:

The Department of Environmental Protection’s mission is to protect Pennsylvania’s air, land and water from pollution and to provide for the health and safety of its citizens through a cleaner environment. We will work as partners with individuals, organizations, governments and businesses to prevent pollution and restore our natural resources.

 

The above is their mission, they chose to accept it. So where in the heck are they? They have all of these side conversations with officials and developers and even residents, but are they like the CIA or something? Why don’t they come out of the shadows and into the light and tell us about their perspective on Bishop Tube? People like sunshine, right?

Why is it there has never, ever been a town hall meeting in East Whiteland with the PA DEP and out State Representative Duane Milne and State Senator Andy Dinniman and the developer about this?  I have wanted to ask Andy Dinniman’s office staff this, but two phone calls and one e-mail within the last week have never been responded to. (Which of course is not satisfactory in the least, nor is it acceptable, is it?)

Here is the list of executive staff of the PA DEP (CLICK HERE) . The Acting Secretary is Patrick McDonnell and of course because he doesn’t actually wish to deal with the public you can’t email him off his page.  But you can read about him on Marcellus Drilling News.

As a matter of fact, it seems that the PA DEP doesn’t want anyone to readily have access to email addresses to their staff, does it? So I was googling and found this name and address.  Would they be helpful at Bishop Tube:

Stephan Sinding, Manager
Environmental Cleanup & Brownfield Program
484-250-5716
Or perhaps this person?

Regional OfficesThe Environmental Cleanup and Brownfields program is responsible for the implementation of the Land Recycling Program and its affiliated procedures and policies through the following six regional offices.Southeast Regional Office
Thomas Canigiani, Program Manager
Environmental Cleanup and Brownfields
Southeast Regional Office
2 East Main St.
Norristown, PA 19401
Phone: 484-250-5960
tcanigiani@pa.gov

Or:
Dustin Armstrong, Environmental Cleanup and Brownfields Program, Southeast Regional Office, 2 East Main Street, Norristown, PA 19401, darmstrong@pa.gov
 
Written comments for the removal of the Chem Fab Site should be submitted to Colin Wade, Environmental Cleanup and Brownfields Program, Southeast Regional Office, 2 East Main Street, Norristown, PA 19401, cowade@pa.gov

So could the guy who is acting head of PA DEP have an e-mail as simple as pmcdonnell@pa.gov ?

Perhaps in an effort to be fair, we should NOT just throw everything regarding Bishop Tube on the developer because can’t it be said culpability also lies with the Pennsylvania Department of Environmental Protection too?

Here is the Southeast region phone directory:
 
Here are a couple of basic numbers:
 
General Information
Main Switchboard and 24-hour Emergency number 484 250-5900
Environmental Complaints, weekdays 484 250-5991
File Reviews 484 250-5910
Fax Main 484 250-5914
 

The Director’s Office is 484-250-5942.

 

PA DEP, come on down. Don’t be shy.  Tell the good people of General Warren Village and the residents of East Whiteland Township and the residents of Chester County where you all as the agency set up to protect us are on Bishop Tube remediation, ok?  The time for contemplation of the proverbial navel is over, you need to stand up and tell us all the truth, or shall we say some facsimile of the above?

As a community we need to talk about what Bishop Tube has done to residents and former workers, don’t we?  Isn’t that the responsible, ethical, moral thing to do before a development gets built and people live there??? Make those companies that were there onsite pay for what happened? If those old companies are forced to pay up then doesn’t remediation happen, developer gets to build, people can be safe, affected people can get care? As in everybody is happy?

Remember these thoughts with regard to Bishop Tube:

  • Apparently, TCE is a non-aqueous (will not dissolve in water) liquid that is more dense than water and will sink through the soils and water and continue to penetrate further into the ground. Remediation of it requires more work than something simple like a gasoline spill. I would assume that means that means that even going 12 feet down may not be an acceptable fix given the length of time that the spills have been there.

  • Given the fact that this is a hillside community there is a significant concern of offsite contamination since this stuff travels downhill.

 

The Pennsylvania Department of Environmental Protection needs to man and woman up and come forward and speak to people about this out in the open.  After all have they or have they not been in part guiding this developer/property owner since they acquired this property in 2005? The DEP can’t just sit behind the scenes talking with this person and that person any longer.  This needs to be out in the open.  That way there is a level playing field for East Whiteland, residents of General Warren Village, former employees of Bishop Tube, potential future residents of East Whiteland who might move to new townhouses constructed on the site, and the developer.

Residents are legitimately upset, the developer wants his project to move forward.  People want a safe project from embryo stages to completed development and beyond.  People want proper remediation, right? Time for the PA DEP to step up, right?  Time for State Representatives and State Senators in the area to step up as well, right?

Call the PA DEP.  Call Dinniman and Milne.  Call the media outlets and ask them to contact all of them.

Yes, you can safely remediate brownfields sites.  It is just knowing publicly what exactly is going on and what can be done. And shouldn’t the PA DEP just clean up this site once and for all anyway? Don’t they have the ability to do so? And lest we forget, the developer did not cause the contamination, manufacturing companies/concerns did. The cause of the contamination is apparent, it is the rest which is always murky.

And don’t sit there reading this post and call people NIMBY (Not in My Back Yard.) People have good reason to be scared of this site.  And all anyone has ever wanted is for this site to be cleaned up.  It’s not the simplistic blanket knee jerk reaction that people are anti-development.  They want the site cleaned up.

And if there are kids still getting back there into Bishop Tube and homeless people, are they really safe? Kids are our future. Doing something on a lark might have consequences when they are adults, right?

Thanks

bishop tube in front of east whiteland march 8

Bishop Tube, August 2015

Tomorrow March 8th is the Board of Supervisors Meeting in East Whiteland. And Bishop Tube is on the agenda.

Bishop Tube. I know, I know I write about it a lot. I can’t help it. The site terrifies me. I wrote about it last week after the Zoning Hearing Board meeting in East Whiteland. The zoning hearing was continued to March 15th .

Also last week there was an Environmental Action Committee meeting. Bishop Tube was a big topic of conversation.  Here are notes that someone (not me, I was not there) took:

–The soil will be cleaned up by the developer in order to build, but it will be years before there will be an attempt at cleaning up the ground water. Sad but true that it may never be able to be cleaned up. This water is NOT going into our water table or any of the streams around us.

–The 20k that the developer said they would put in escrow to help with the cost of the upkeep, testing and maintenance on the vapor mitigation system is not enough. We all know that but apparently the developer thinks it will be enough. John Buzan (ran the meeting and maybe he’s the head of the EAC I don’t’ know) agreed that 20k wasn’t going to cover it.

–The developer isn’t involved, nor has to deal with the plans for ground water cleanup…I’m pretty sure this is what I understood.

–The township has asked DEP to oversee the vapor mitigation system and ground removal but they have not agreed to this as of yet. They are responsible to oversee the water run off though.

–There will be a third party hired to continuously test the soil and air and water surrounding the site for contaminates as the construction is done. This company will report to the township but will be paid for, but not picked, by the developer.

–If ever a sewer, or something like that has to be dug up; the people doing this will have to wear protective gear in order to be sure there are no contaminants that they would breathe or come in contact with.

–The developer has contacted the railroad (sorry can’t remember name of company – it is not the R5 but a freight train that runs through there) to talk of re-doing that under pass as it is in very poor condition. No answer yet.

 

Also today I received a response to questions I had asked, advice I had sought from a professional not connected to this whole scenario regarding Bishop Tube.  The response was illuminating, and on the eve of yet another meeting where Bishop Tube is discussed, I feel obliged to share:

  1. Developer should be able to offer some kind of proof via testing that the site is cleaned up and meets DEP standards.

  2. Apparently, TCE is a non-aqueous (will not dissolve in water) liquid that is more dense than water and will sink through the soils and water and continue to penetrate further into the ground. Remediation of it requires more work than something simple like a gasoline spill. I would assume that means that means that even going 12 feet down may not be an acceptable fix given the length of time that the spills have been there.

  3. Given the fact that this is a hillside community there is a significant concern of offsite contamination since this stuff travels downhill.

  4. If developer is serious about cleaning up contamination properly then he ought to have no problems issuing a bond that would be utilized to clean up any contamination later found in the community after he has sold and moved on. Hope this helps.

 

Sigh.  Every horrible thought I have had is true? This TCE laden site is as horrible as everyone says it is? And what about the 4th big contamination point Keith Hartman keeps trying to get people to pay attention to? Cesspools, mineral salts leeching into the creek?

I have grave concerns given what the developer said they are doing at the Zoning Hearing Board Meeting.  Remember the exchange I noted between the Delaware Riverkeeper and a developer witness, whom I believe was an engineer?

Here:

I was taking notes like crazy and this one exchange was so interesting – I did my best to be accurate but again I do not take dictation and I am not a court reporter, although there was one there:

Maya: “I would have you speak to what in fact what is left for DEP to to review and decide upon and what process is still left?

Two – There also seems to be this suggestion that anytime additional contaminants are found that they are going to be cleaned up, and so this site is going to be cleaned up…and so  I would like you to speak to this issue of whether or not in fact when you are done at this site that all of the TCE and toxic contaminants will be removed, so people don’t have to be concerned about it, or in fact is that not true and you have specifically and carefully with all your  communications with DEP actually limited the scope of your remediation including not going to uhhh saturated soils for example, 12 feet below ground surface, etc?”

 

Witness for developer: “That’s absolutely correct.”

 

Maya cuts back in “You are not? You are limiting, you are capping how much work you will do and you will intentionally leave contaminants on the site and people need to know that.”

 

Witness “That is correct.  Allow me to explain in a way that is no way nefarious…”

 

He (witness)  goes on to explain liability and  an old consent order (??is that right???)  with DEP and state version of hazardous clean up – PRPs – potentially responsible parties.  He goes on into known contamination beyond the scope of their legal responsibility – about how they will clean up so much and then it seems it will be up to DEP to enforce clean up by PRP potentially responsible parties that I guess are former manufacturing occupiers of site?

 

Witness acknowledges issues, discusses how developer will be doing more beyond satisfying their part of old (?) consent order (?) and will excavate three known soil contamination issues of the site above water table, excavate, clean up according to most stringent PA standard, residential statewide heath standard…acknowledges caused contamination of groundwater on site that migrates off site, affects tributaries of Little Valley Creek.  They believe their  soil excavations will have a beneficial effect towards clean up.

 

(Deep breath) Look at what was sent to me today with regard to suggestions, and put it side by side with what the developer is doing…it’s NOT enough what they are suggesting, is it?   And I am sorry I do NOT buy that super sized density is the ONLY way to get this cleaned up, do you? I accept the site will be developed, I have for years. But not without the proper clean up and remediation and is this place ever going to be truly safe for people to ever live there?  Maybe a NON-residential use would still be the best solution? And the other day I heard homeless hang out there?

Bishop Tube is a KNOWN problem child and has been known since the plant was still open. I have heard from reliable sources that former union guys there who are still alive are VERY concerned about this getting cleaned up. And comments from General Warren Village residents are the same.  Referring to it as a “cancer belt” back there, listing neighbors who were also in a lot of cases former Bishop Tube workers who died horrible deaths from scary cancers, respiratory issues.

Things are thankfully different today, and given the current temperature in Washington DC we have to stay on top of elected officials to make sure we all stay protected. But given how different things are today I find it difficult to comprehend that the Pennsylvania DEP hasn’t done more on this site, hasn’t been more proactive on clean-up.

After all, it has been years and years.

Queue Daily Local 2007 article (again):

…..Hartman, 51, started working at Bishop Tube in 1973 and worked alongside his father, who worked at the plant for 42 years. Both were millwrights and worked in maintenance.

Worst, 53, started in 1972 and worked in a variety of jobs and was president of Local 7566 of the AFL-CIO United Steel Workers of America in 1988 and 1989. He left Bishop Tube in 1989.

In an interview in February, Worst recalled what it was like working at the plant.

“There were large clouds of trichlor fumes that floated through the plant every day. I distinctly remember how it smelled,” he said.

Keith Hartman and Lester Hartman used to work in what was known as the trichlor pit surrounding the vapor degreaser area in building No. 8, the area of the heaviest TCE contamination on the site…..

“There would be two people down in the pit and a spotter above. We’d be down there for hours. When you came out, you felt dizzy, drunk, and there was a tingling sensation in your hands,” Hartman recalled.

“One guy they used to have to carry out. Afterwards, we’d go to the lunch room to wait until the effect wore off. I always wondered why the supervisors never bothered us when we were up in the lunchroom,” he said.

Hartman recalled another Bishop Tube employee, Charles McDonough, who also worked in the pit. He died of Parkinson’s disease and Alzheimer’s. Another employee who worked in the pit is Calvin Chandler, 84. Chandler has emphysema and chronic obstructive pulmonary disease.

Worst and Hartman said their colleagues Jack Laidley, William Reidfern, Eddie Blain and Paul Blain all had died of cancer. Reidfern also had heart disease.

Three fellow workers suffered from cancerous neck tumors. Bill Hines of West Goshen had a malignant cancer on his neck and died. Irvin Whistler has a cancerous tumor on his neck but has survived. Raymond Buckwalter, another resident of General Warren Village, has a tumor on his neck that turned malignant and now suffers from lung cancer….In 2005, Brian O’Neill of O’Neill Property Group purchased the site for $700,000 through his affiliate, Constitution Drive Partners, and signed an agreement with the state Department of Environmental Protection (DEP) to jointly clean it up. The plan is to keep the buildings and convert it for light industrial use.

 

There are all these EPA Acts now:

Summary of the Emergency Planning & Community Right-to-Know Act 

Summary of the Comprehensive Environmental Response, Compensation, and Liability Act (Superfund) (CERCLA)

The Superfund Amendments and Reauthorization Act (SARA)

Emergency Planning and Community Right-to-Know Act (EPCRA)

Resource Conservation and Recovery Act (RCRA) Laws and Regulations

Manufacturing concerns operate under the above today.  Their employees have to have training and I believe annual re-certification under these Federal Laws.

Creating as little as slightly over 2 pounds of hazardous waste today brings a facility  under RCRA rules, for example.  If Bishop Tube was a site generator today they would be registered with the EPA and have a special site identifier number.

Now, here is something: if you research the EPA and these laws I believe you will see that the EPA clearly lists wastes that are hazardous if improperly disposed of – 400 substances known to be harmful to human health AND the environment. These things can be ignitable, corrosive, toxic or reactive.  They could be solids, liquids, or gases – things like TCE, battery acid, mercury, spent solvents right?

Penalties for violations of improper disposal can be up to $1 MILLION dollars and jail time of 15 years, so can someone please explain why the PA DEP is dicking around with Bishop Tube? Sorry to be vulgar, but my God, they KNOW it’s bad, right? remember the 2008 report by the US Department of health and Human Services?

BEFORE anything gets zoning variances or final plan approvals, CLEAN UP.

And I know for a fact that residents in General Warren have been in contact with PA DEP.

Mostly (trying to be fair) can it be said they get patted on the head and told that they are working towards choosing a remedy for the site?

And why is it a year ago residents reported construction activity on the Bishop Tube site complete with giant debris clouds wafting into nearby neighborhoods?  O’Neill has significant brownfields experience BUT can the same be said of Benson?

People in General Warren are terrified.  Old timers, multi-generational residents, new residents. It doesn’t matter.  They want to be safe, they want people who may or may not live or use the Bishop Tube site in the future to be safe and again why so long to clean things up there?  Back when the PA DEP was starting to pay attention to Bishop Tube, why didn’t they start to remediate THEN? You know when there was more money for remediation? Remember their press release circa 2007?

HERE:

MALVERN, Pa., May 25 /PRNewswire-USNewswire/ -- During a visit to the
 former Bishop Tube site in Chester County, Environmental Protection
 Secretary Kathleen A. McGinty talked about the importance of a program that
 helps the state respond to environmental emergencies, clean contaminated
 sites, protect the public's health and promote economic growth....
Bishop Tube was founded in 1842 for the manufacture of gold and
 platinum alloys for technical and industrial uses. It was also used as a
 metal fabrication facility in the 1950s. However, after a number of
 different owners, operations stopped in 1999, leaving behind a legacy of
 contamination that included TCE, nitric acid, hydrofluoric acid and heavy
 metals, including nickel and chromium. TCE is the primary contaminant of
 concern.
     Through HSCA, DEP has worked to investigate and assess the
 contamination at the site, maintain a safe water supply for an affected
 nearby resident, develop remediation alternatives, and facilitate public
 participation in selecting a remedial plan. Currently, the fund is helping
 to install a system that addresses shallow groundwater contamination at the
 site.
     Additionally, the site's new owner -- Constitution Drive Partners LP --
 has entered into an unprecedented cost sharing partnership with DEP whereby
 Constitution addresses the contaminated soil and DEP addresses the
 contaminated, shallow groundwater. Soil remediation is expected to take 2-3
 years to complete, but groundwater remediation will take much longer.
     To date, DEP's investigation of the contamination has cost more than $1
 million and it is expected that an additional $700,000 is needed to
 complete the onsite shallow groundwater remediation. All DEP work has been
 made possible through the Hazardous Sites Cleanup Act.

General Warren residents and other concerned residents? Please take the time for meeting tomorrow.  I know these meetings aren’t fun, I have done my time at them over the years BUT you need to advocate for yourself and your fellow neighbors.  You can’t depend on elected and appointed officials to be clairvoyant.  Packed boardrooms send a message. If you can entice media to cover you, even better. Sunshine makes the world go round, right?

Here is the list of media that residents can contact to ask them to give coverage to Bishop Tube:

1) Daily Local News:

610-696-1775

2) Philadelphia Inquirer:

(215)854-4500

3) CBS 3:

philadelphia.cbslocal.com/about-us/contact-us/

4) ABC 6:

215-878-9700

6abc.com/contact

5) NBC 10:

610-668-5510

nbcphiladelphia.com/send-feedback

6) Fox 29:

888-369-4762

comments@foxnewsinsider.com

Here is DEP info – Residents can and should contact them directly with questions and concerns. As is the case with elected officials, township employees, and media, just try your best to be polite.

Division of Hazardous Waste
Bureau of Waste Management
PA Department of Environmental Protection
14th Floor Rachel Carson State Office Building
PO Box 69170
Harrisburg PA 17106-9170
717-787-6239
E-Mail: ra-hazwaste@pa.gov

Tom Mellott — Division Chief, Hazardous Waste Management
Melissa Gross — Chief, Compliance and Information Management
Glenn Mitzel — Chief, Permitting and Technical Support

DEP REGIONAL OFFICE CONTACTS
SOUTHEAST REGION,
Norristown
484-250-5902

SOUTHEAST REGIONAL OFFICE
DEP Southeast Regional Office
2 E. Main Street Norristown, PA 19401-4915.
Phone: 484 250-5900 (24 hours/day)

Acting Regional Director: Anderson Hartzell

Counties served: Bucks, Chester, Delaware, Montgomery, and Philadelphia.

#alternativefacts

I received an article this morning with the following note:

They have all lost their tiny minds….Typical sales tool for developers…

Small lots “by design” because NO ONE wants to take care of a big yard…just sit INSIDE with their little couch potatoes, lots of “family time” in front of the TV…oh, how healthy.

Disgusting propaganda on all counts, all at our expense…ugh.

Ahh yes…developers the original architects of #alternativefacts
Malvern Named ‘Hottest Suburban Town’ By Philly Magazine

The borough is in a “gold rush” of housing the magazine says.

By Max Bennett (Patch Staff) – March 6, 2017 12:26 pm ET

Malvern was named one of the area’s “10 Hottest Suburban Philadelphia Towns” in Philadelphia Magazine’s March issue.
Malvern joined other towns such Armdore, Newtown (Bucks county) and Phoenixville. Click here to see the full list.
“Malvern is in the midst of a gold rush of sorts,” the magazine said. “Buyers looking to get into the excellent Great Valley School District and close to the Main Line at a good price (realtors like to refer to this as the Upper Main Line, much to Gladwyne’s chagrin) are making grabs for newly converted land.”

The Philadelphia Magazine article itself targets quite a few areas, including Phoenixville, West Chester, and Malvern. Here is a screen shot of part of what they say about Malvern:


#AlternativeFacts let’s break this down:

  1. When they say “Malvern” they should be saying East Whiteland – and  that is what they are picturing above with the rendering of the continuation of O’Neill’s Worthington.  Is it being petty to note that they don’t mention the Bishop Tube project?
  2. This is NOT the “Upper Main Line” or “Main Line” and never will be. It’s Chester County and having spent over 30 years living on the actual Main Line, thank goodness for Chester County.
  3. Realtors need to refresh on actual history. The Main Line ended in Paoli where the namesake train line ended.
  4. With all that is being developed this area is not going to look like the Main Line it’s going to look like King of Prussia meets Bensalem meets Broomall.

It’s like all the blurbs are peppered with developer names. Is that how the world is beginning to view Chester County? By the developer? I don’t see a Toll Brothers development in every community as a positive do you?

And the whole #alternativefacts in development speak is nothing new. Take Downingtown. There is nothing wrong with saying you are from Downingtown when talking about either the borough or outside of the borough.  But how do developers describe a healthy percentage of any development in Downingtown?  They call it Chester Springs. Soon they will call Coatesville Chester Springs. 

What will they call Kennett Square? Down at that end of things everything seems to be under the blanket of “Chadds Ford” even if it isn’t, huh?

And Crebilly? Will that become “Newtown Square West” in honor of the Tollification of Foxcatcher Farm since the density proposed for Crebilly is almost the same house count for what they now rebranded Liseter?

And all these McMansion dwellers? Where do they think their food comes from and will come from as acre after acre of farmland and open space is developed into Tyvec wrapped boxes stacked so all live like lemmings? Do they think their food is grown in the aisles of Wegmans or on the roof of Kimberton Whole Foods?

Mark my words, this development “boom” is not endlessly sustainable. But by the time everyone figures it out it will be too late.

But hey, #alternativefacts aren’t just for Washington D.C., right?

bishop tube plan met with a packed east whiteland zoning boardroom

plan-2

The developers did not show up with very many copies of site plans.  I do not think they were expecting a completely packed room which included people standing for the East Whiteland Zoning Hearing Board meeting on February 27th.

zhb-feb-notice

It was so amazing to see all the people turn out.  General Warren Village and General Warren Village supporters did an AMAZING job.

17078041_1462119317134348_485323212_nAnd they had a powerful and unexpected ally in the room: Maya K. van Rossum, The Delaware Riverkeeper.

The role of the Delaware Riverkeeper is to give the Delaware River, and the communities that depend upon it and appreciate it, a voice at every decision-making table that could provide help or do harm. The Delaware Riverkeeper Network that van Rossum leads is the only citizen action organization that works the entire length and breadth of the Delaware River and its watershed, speaking and working for both its protection and its restoration. Delaware Riverkeeper Network has its main office in Bristol, PA and can be found on the web at www.delawareriverkeeper.org. van Rossum’s blog can be found at http://www.delawareriverkeeper.org/blog/ – they have a Water Watch hotline and well, in an era of David vs. Goliath, they give “David” an edge.

Maya was an incredible addition  to last night, and I will get to that later. (she is FIERCE!)

16998854_1462074723805474_8464149577059753216_n

We did have one of the three supervisors in attendance last evening, which I found heartening.

East Whiteland also sent a solicitor to represent at the zoning meeting on Bishop Tube.

Here are some notes taken on the fly – so feel free to add to them or correct:

  • Board of Supervisors responded last evening via attorney to concerns. Township is closely monitoring remediation, impact of remediation, standards and monitoring of remediation etc etc.
  • Township wants safer environment. Township right now in opposition of variance according to lawyer unless certain conditions met with Township.
  • DEP has approved conditions*  BUT township reviewing. BOS is reviewing with EAC and then they will decide whether to object to variance request.
  • March 15 special meeting being asked for by Zoning. The meeting (hearing) was ultimately continued to March 15, 2017 at 7:15 PM  
  • * “Conditions” referred to above Developer expert is talking about conditions discussed with DEP- didn’t catch all – witness for developer was speed speaking:
    ~ Establish a separate environmental escrow associated with development $20 k
    ~ Non refundable deposit to future HOA
    ~ Applicant will remediate 3 major hotspots in accordance with scope of work submitted to DEP – digging out soil as per Act 2. But it isn’t Act 2
    ~No disturbance in 3 soil hot spots until remediation complete (New construction?)
    ~ Applicant will install vapor mitigation systems. Most stringent available designed by engineer. Review said systems, maintain?
    ~ Developer would obtain stormwater permit – county/state – did not catch acronym
    ~developer will provide access to DEP etc
    ~ utilities will be developed to prohibit vapor migration/ groundwater migration
    ~environmental covenant
    ~ developer will comply with local zoning
    ~ developer will document remediation
    ~ until 3 hot spots remediated no construction of residential units.
    ~ developer would submit demolition plans to township and DEP

(NOTE: very abridged version of above – expert was speaking so very quickly and I don’t take dictation professionally so I did my best – I know I missed one of the conditions – feel free to add or clarify in comments.  It would be helpful if media had covered meeting, but I did not see any media there at all.)

  • Something about collecting storm water and capture and release to stream? Not sure if I heard that right . ZHB has concerns about retaining wall and safety- 20+ storm water “systems” – all release to stream. What environmental impact does that have considering existing toxicity of site? How is water cleaned? Whose job will it be to stay on top of that?
  • Final stormwater discharge into / near emergency access so does that mean General Warren gets water?
  • GWV residents are pointing out a shallow stream expected to take developer’s stormwater. Is GWV in part going to be part of stormwater management plan? They say no construction vehicles on village way (developer)?
  • Maya (Delaware Riverkeeper) asking about volume reduction and other things relating to creeks. Asking about correspondence on sampling between developer and DEP. Asking about TCE staying in place?
  • Residents questioning stormwater retention basin(s) and retaining wall.
  • More questions on stormwater runoff into stream and does stream have capacity to handle it?
  • Vapor intrusion being discussed by older gentleman- potential cancer cluster – people with cancer in General Warren Village? (couldn’t hear all of it clearly)
  • ZHB kept quizzing on removing top soil, Remediation , etc
  • Elevation from General Warren Village to retention walls eye level according to developer witness? Residents asking what they would see from Village Way? Someone from General Warren remarked about being able to see from “bathroom windows”
  • Maya the Delaware Riverkeeper talked about the planting of trees and trees they were removing – good point as developers tend to remove and replace NOT with the same size plantings.  And they spoke of riparian buffers, but not what they consisted of or if they would be substantial.
  • Keith Hartman who worked at Bishop Tube is asking questions. He is extremely knowledgeable about site. He spoke about how they used to “dispose” of the toxic chemicals in one part of site in the old days (sounded like they just dumped stuff kind of wherever?)
  • Mr Hartman pointing out toxic hotspots – see dark grey areas – and asking about mineral salts.16997882_1656917767655212_7768959074626449609_n

 

 

  • Mr. Hartman asking about sampling near old parking lots that were near spill. Not sure but it might have been that 1981 incident?

1981-bishop-tube-acid-spill

  • A gentleman (I guess investigator?) from PA DEP   visited Mr. Hartman recently – Marinelli or Martinelli? (Not sure but found a Martinelli listed HERE.)

16996122_1656917777655211_6973859171944418389_nHere are  articles where Mr. Hartman was in the paper – he knows the site SO well:

For Bishop Tube workers, danger lurked for decades

 By Anne Pickering Daily Local

 

Bishop Tube site possibly up for development

POSTED: 07/26/15, 6:47 PM EDT

“Don’t let them blow smoke up your tailpipe,” said Keith Hartman, “those mineral salts must be cleaned up.”

Hartman worked for Bishop Tube when the plant was still in operation. He, like many neighbors who attended the meeting, are concerned of possible health risks to potential residents if the site is not cleaned up properly.

 

In January there was a follow up article in Daily Local about Bishop Tube:

Plans to develop contaminated East Whiteland site resubmitted

POSTED: 01/25/17, 2:09 PM EST

…..When asked what kind of remediation the site needs to undergo before construction can begin, Virginia Cain, a DEP spokeswoman, wrote in an email that the former tubing plant will need soil and groundwater remediation in accordance with cleanup standards set forth in Act 2.

Act 2, also known as the Land Recycling Program encourages “the voluntary cleanup and reuse of contaminated commercial and industrial sites,” according to the DEP.

Cain wrote that the standards in Act 2 can include both statewide health standards and site-specific standards.

When asked if the site is considered a “Superfund” site, Cain wrote that “Superfund” sites refer to a federal program, but that the Bishop Tube site “is currently on the Pennsylvania Priority List and under the authority of the DEP’s HSCA (Hazardous Sites Cleanup Act) program, which is similar to the federal Superfund program.”

17022164_1656917744321881_1116283631204593680_nNow one of the most interesting parts of the meeting occurred between Maya The Delaware Riverkeeper and one of the developer witnesses (some sort of engineer I thought).  It was at the end of the meeting before they called it to continue March 15th.

I was taking notes like crazy and this one exchange was so interesting – I did my best to be accurate but again I do not take dictation and I am not a court reporter, although there was one there:

Maya: “I would have you speak to what in fact what is left for DEP to to review and decide upon and what process is still left?

Two – There also seems to be this suggestion that anytime additional contaminants are found that they are going to be cleaned up, and so this site is going to be cleaned up…and so  I would like you to speak to this issue of whether or not in fact when you are done at this site that all of the TCE and toxic contaminants will be removed, so people don’t have to be concerned about it, or in fact is that not true and you have specifically and carefully with all your  communications with DEP actually limited the scope of your remediation including not going to uhhh saturated soils for example, 12 feet below ground surface, etc?”

 

Witness for developer: “That’s absolutely correct.”

 

Maya cuts back in “You are not? You are limiting, you are capping how much work you will do and you will intentionally leave contaminants on the site and people need to know that.”

 

Witness “That is correct.  Allow me to explain in a way that is no way nefarious…”

 

He (witness)  goes on to explain liability and  an old consent order (??is that right???)  with DEP and state version of hazardous clean up – PRPs – potentially responsible parties.  He goes on into known contamination beyond the scope of their legal responsibility – about how they will clean up so much and then it seems it will be up to DEP to enforce clean up by PRP potentially responsible parties that I guess are former manufacturing occupiers of site?

 

Witness acknowledges issues, discusses how developer will be doing more beyond satisfying their part of old (?) consent order (?) and will excavate three known soil contamination issues of the site above water table, excavate, clean up according to most stringent PA standard, residential statewide heath standard…acknowledges caused contamination of groundwater on site that migrates off site, affects tributaries of Little Valley Creek.  They believe their  soil excavations will have a beneficial effect towards clean up.

 

I do not think enough monies being set aside by developer to pay for experts East Whiteland may need to hire are much because experts are expensive – environmental lawyers and environmental engineers. Monies quoted could disappear quite quickly – those experts bill expensively, right? And what about any monies for future HOA? How does East Whiteland know if THAT is sufficient?

Other questions that  I have include the fire department – as the plans are currently drawn up are there any indications from East Whiteland Fire Department about cartways and whatever you call them? Will all fire apparatus be able to navigate site?  I feel that this  is VERY important – it is not just abut emergency access from General Warren, but will ALL of their apparatus safely navigate the plans as currently available? Those big rigs need room!

A related aside – here are the LLCs on the developer side:

16991694_1656361451044177_7467780664617090460_o 17038963_1656361521044170_6151837136672422606_o16998658_1656361344377521_3476224322423310321_n

As I said previously, O’Neill knows how to do brownfield developments, but what about Benson Companies? I can only find Benson on Houzzz, no current website.  No mention of Bishop Tube on O’Neill’s website so that is somewhat concerning and want to know why? Two words: Linden Hall. Remember when Benson was thought to have been the savior of old Linden Hall? If they received their approvals for townhouses at Linden Hall, how they were going to restore Linden Hall itself as a new office for them? What did we see instead?  Wasn’t it selling approved plans to Pulte and no rehabilitation thus far only minimum maintenance?

And then there is the issue brewing in Tredyffrin Pattye Benson alerted everyone to. Historic Howelleville being their location for yet a total community destroying cram plan? And what of how Radnor residents feel about Benson?  I have to ask can Benson actually be trusted here? Or will residents go through all the heartache and meetings to have these plans sold off to someone else?

I do not recall last evening that the developer’s attorney got into the whys of it all concerning WHY the developer is seeking zoning variances, so will it be the battle cry of “economic hardship”? Or, they can’t build without a variance which would increase density in an already dense plan? And why is any developer’s potential economic hardship a burden a community getting a plan inflicted upon them not by their desire in the first place?

This site is going to be developed, I am not arguing that.  I have never argued that.  But it is a very toxic site because of the TCE and whatever else was left behind and is lodged in the land, the aquifer. How the site gets developed has always concerned me and I ask again, is this the best use for the property?

What of impact on the school district?  How are a few more hundred to potentially few thousand kids from this plan combined with Atwater and any other development large or small going to affect the school district? Has the school district weighed in on this?

Traffic lights proposed?  Who is paying for that if variance is waived? The previous zoning is in place to help preserve open space or farms or industrial from being over developed.

And what kinds of complementary businesses will be added to the surrounding area to support these new homes? Will that zoning need to be changed too?  What is it costing East Whiteland residents in legal fees for all of this now (let alone the future)? Will this plan be one that is truly economically viable for East Whiteland or become another millstone around East Whiteland’s proverbial neck?

Why always townhouses instead of single family homes?  Lighting and noise? How will this development affect General Warren Village with regard to those issues?

I do believe that the Zoning Hearing Board is weighing this all carefully, but I would say that residents MUST keep up the pressure.  Packing the boardroom last evening was a great start.  But there is a while to go.

I have done my best to relay my meeting notes accurately.  Others may add to them.  Of course it would be helpful if the media took an interest. And it would be helpful to hear what development happy Brian O’Leary of the Chester County Planning Commission thinks? Does he have an opinion?  He was around serving in Lower Merion when ROHO and O’Neill’s now defunct Rock Hill Road project came about, so realistically he knows a similarly dense plan THERE was horribly unpopular as was the B.S. developer driven zoning overlay that allowed it, doesn’t he?

And what of the PA DEP? Don’t they have an obligation to make the PRP (Potentially Responsible Parties) freaking clean up the Bishop Tube site???  After all the developer will not be responsible for all that should be done so why when discussion of clean up started here so long ago, it has never happened? Remember that Law360 article from 2014 in addition? Or the memorandum from the case that was in Federal Court over this site most recently? How is it a Federal judge did not get the gravity of Bishop Tube?

There you have it in conclusion – the worst part about Bishop Tube is the longer this goes on the more we have to ask ourselves how we got here and what exactly is the PA DEP going to do about it, let alone the EPA on a Federal Level?  Or what about state elected officials? Duane Milne and Andy Dinniman? Duane Milne was all Mr. Press Release in 2007 but what has he done for anyone lately?

Where is Erin Brocovitch and Tom Girardi when you need him? Call me crazy but I think General Warren Village and neighboring Malvern Borough residents deserve the best thing possible with regard to this plan, don’t you?

Sigh…to be continued….feel free to leave comments anyone who was in that packed room last night.

plan-1

bishop tube and o’neill in front of east whiteland zoning monday february 27, 2017

19901979924_c9ab98eabc_o

It is once again, Bishop Tube season in East Whiteland. I last wrote about Bishop Tube this past January ( see toxic nightmare site bishop tube goes back to zoning…).

Well Bishop Tube was at Planning already this week, O’Neill is also speaking at an East Whiteland Business Networking event this evening – “Guest Speaker Brian O’Neill will provide insight on development in the East Whiteland area.”

Bishop Tube was postponed until February 27 Zoning, and somehow I doubt many residents impacted by Bishop Tube will be at the networking event this evening, but if I lived in General Warren Village I would go (but I digress).

 

zoning-2

 

Above is the legal notice for Bishop Tube in front of East Whiteland Zoning.  I will note there is NOTHING posted on East Whiteland’s website about this February 27th meeting yet…but hey why stay on top of sunshine on a sunny day, right?

Anyway, I am supportive of the folks in General Warren Village, and even the Malvern Borough residents who will be directly impacted by this plan, so I am posting the following information written by a resident over there:

 

On Monday, February 27 at 7:15 there will be a township meeting to discuss the Bishop Tube Site project. Here is a brief overview from what we have learned so far.

20337938589_16f0f784fc_oBishop Tube is the old manufacturing facility that is located at the end of Village Way and is accessed by Malin Rd and route 30, near the Giant Shopping Center. O’Neill Properties, who own this property now, wants to develop the site to include 228 town homes. They would be in rows of 3 to 7 in length and they are asking for a variance from the township for the rows that are greater than 6. In addition, they are asking for variances to change the natural slope in the land. This would be to excavate the area and provide an area for the new housing to be built. In order for the sloping to work they would need to add a retaining wall around the east side of the property, along the creek. The highest point of the retaining wall would be 18 feet. At the meeting, we couldn’t tell from the drawing how this would look or impact the residents on that side of the Village.

Within the property there are three areas where the previous owners reported the release of Trichloroethylene (TCE), which is a chlorinated solvent and is used commercially as an industrial degreaser. These areas would be cleaned up by soil excavation and would then become green areas. They discussed removing 6,700 cubic yards from the site as part of this cleanup effort. They also noted that the remedy for cleanup would be selected by DEP in 2017.

Another area of concern for Village residents is that they want to add emergency vehicle access from Village Way through to the new neighborhood. They are saying this would be needed because of the number of homes in the new development and because if there was a train derailment on the Malin Rd side, emergency vehicles would have to use Village Way to access this new neighborhood.

Please come to the meeting on Monday. Your presence will help us show a concern for our neighborhood and hopefully help the township make the right decision.
Here are some of the questions that we have so far…
Once that dirt is being excavated what is the impact to the air quality and ground water?

Will there be any additional ground testing to determine if other areas of the property have been impacted by contamination of TCE or other products?

What are the overall impacts to living in proximity to this cleanup effort?

How will the retaining walls look from our community?

Are we guaranteed that their will only be emergency access from Village Way?

 

So I wonder, are Benson Companies still doing the building? They are in spotlight in Chester County again, and not in a positive way for their planned development in Howellville in Tredyffrin aren’t they?   I also wonder why so many units have to be shoved into/onto a toxic site? What about the potential issues down the road? Building slab on grade with no basements doesn’t necessarily mean any leftover chemicals that escape clean up will be encapsulated, right?  And where are the DEP and EPA on this clean-up? Or is this all just going to disappear considering the new administration in Washington DC doesn’t seem to place much value on things that concern every day people?

Density. How much do we need? Do we live in Chester County so we can feel like we live in King of Prussia, Bensalem, and development ridden Mongtomery County up the 422 corridor???

None of this development is ever done with consideration to existing residents who pay taxes in an area.  None of this development is ever done with keeping all the OTHER plans in a municipality and neighboring municipalities in mind.  All of these developments show up on flat, out of context plans on a monitor at a zoning or planning meeting as if the are some sort of Valhalla complete with Elysian Fields.

Bishop Tube is no joke.  It’s literally a deadly toxic site.  So before they approve HUNDREDS of living units with variances that a lot of residents feel will further squeeze a getting over-developed township AND a school district and not for the positive, how about someone show folks that the place is cleaned up? Or publicly state (including to the media) exactly where the clean up is?

Yes, O’Neill has redeveloped many brownfields, built many units.  But should we forget Riverwalk Millennium in Conshohocken?  The multi-million dollar settlement to residents who lost everything and pets in that fire? Should we forget the battle in Massachusetts to keep him out of the Alewife forest? Sadly, in the end residents and nature lost that.  The silver maple forest was lost when approvals were given for the  Residences at Acorn Park, a $70 million, 299-unit apartment complex in the Belmont Uplands, which residents there did not want, did they? Or any of the developments in Lower Merion (Barker’s Mill and Rock Hill Road), a lot of which took years off the lives of residents attending meeting after meeting and what of the ones that never happened but stressed residents out?

And what about Portsmouth/Newport Rhode Island? Take a look at this:

Hard times for Carnegie Tower: Recession, soft market leaves luxury highrise in Portsmouth mostly empty

By Christine Dunn
 Providence Journal Staff Writer Posted Jul 24, 2015 at 7:31 PM

PORTSMOUTH — With their designer kitchens and baths, private elevators and balconies with soaring views of
Narragansett Bay, the luxury condominiums at the Carnegie Tower have undeniable glamour.

 But the 22-story tower, which opened in the summer of 2009, turned out to be a losing prospect for developer J. Brian O’Neill.
newport
The 79-unit tower opened when the housing market was in freefall, and in 2012, 77 of the condos remained unsold….Within a few months after the opening, several prospective buyers sued to get their deposits back. And in 2012, O’Neill had to refinance to avoid a planned tax sale of 77 tower condos by paying the Town of Portsmouth more than $2 million in back taxes.
The final blow came in January, when the Pennsylvania-based builder turned over an estimated 68 of the condos to his creditors in a deed-in-lieu-of-foreclosure transaction.

 

Ok so look at that tower? Remind you of anything else? Perched on 202 at 29 in East Whiteland  perhaps? Royal Worthington? Everything looks the same no matter where it is.  Myabe if I was a Stepford wife I would be more appreciative, but I am not.

11754513_1023066781039606_1884189869366716865_o

But what is more concerning is the occupancy as in truly how many live there and in other surrounding developments.  I also do not believe Eastside Flats in Malvern Borough is filled to capacity and what about that tower like thing on route 3 near Matlack? The Pointe or whatever? Any of the townhouse developments around? Atwater?

Pick a development. Pick a developer. There are so many, and that is kind of the point.  Is there a real need or an artificially created need? Look at an O’Neill development proposed for Haddonfield, NJ? Residential, mixed use, and a drug rehab? Look at the density of that plan. It’s not just here – at it’s most watered down, developers all have a formula for profit, they just keep applying the same formulas everywhere they go.  Toll Brothers is another example.  Pulte. Ryan. Benson. And so on and so forth

This is how the vision of completed Worthington goes.  Does this look like the Chester County you want to see? It looks like the King of Prussia mall!

This is how the vision of completed Worthington goes. Does this look like the Chester County you want to see? It looks like the King of Prussia mall!

All of these living units add people to our roads. They add kids to the school district.  And no one ever talks about how that affects residents…until it is too late and communities are faced with a crisis.

I have no problem with developments that are thoughtfully planned with an existing community in mind.  Only you RARELY see that.

Bishop Tube is a scary hot mess. And obviously there are still issues keeping the site secure because I just found a 2017 You Tube video about Bishop Tube. I never trespassed when I photographed. I shot from the street only.

 

 

The people who need to pack the room on Monday, February 27 are the ones with legal standing as this is a zoning matter.  So that is at it’s most specific,  General Warren Village residents, and on the border Malvern Borough residents.  But I also encourage anyone who can, to go out and support these residents. That is the best thing a community can do when not all have standing.  Packed board rooms send a message.

Stand up for your communities.  If you don’t you will always get the short end of the development stick.  Bishop Tube needs to be cleaned up before development occurs.  It also needs less density.

Here is the January notice:

This photo was taken in 2010, long before I lived in Chester County. It was taken by d.coleman in June of 2010. I found it on Flickr. This is a screen shot of photo with attribution and description as found in yellow. Photographers have been photographing Bishop Tube for years and I hear that high school kids find their way onto the site as well?

This photo was taken in 2010, long before I lived in Chester County. It was taken by d.coleman in June of 2010. I found it on Flickr. This is a screen shot of photo with attribution and description as found in yellow.
Photographers have been photographing Bishop Tube for years and I hear that high school kids find their way onto the site as well?

Look, O’Neill to an extent is a visionary…and a gambler. But I think to succeed where he has succeeded you can’t have one with out the other. And yes, he has been extraordinarily generous with East Whiteland’s fire company, but why is it no one in East Whiteland (much like Tredyffrin and elsewhere in Chester County) can seem to hit a pause button on development or to actually fight for residents so that development is not so painful?  Because residents are the ones who pay the piper after the first blush of ratables is concerned.  Residents deal with the traffic, infrastructure issues, basic services and first responder (police/fire/EMT) issues, overcrowding in schools.

There are so many developers, so many plans. But we live here too.  And it is time for municipalities to hear us.  Here is hoping residents totally pack the zoning hearing board on Monday February 27 at 7:15 PM at East Whiteland Township.  And I hope the residents of General Warren Village represent.

The bottom line is something is going to get built on Bishop Tube. It’s a gross, toxic eyesore.  But what gets built, how the remediation goes, and so on still has to do with how the community feels.  If residents do not turn out, they will lose one of the few opportunities they have left to have a say.

My opinion is O’Neill can do this if he wanted do it with less density. Or he could offer another use for the property that wouldn’t impact residents so horribly.  But people have to turn up and speak out. Because look at it this way: if this plan gets approved and sold to yet another developer, the community needs to lock in the plans to the best that the community can get and stomach.  And most importantly to ensure the remediation is done the best it can be, right?

 

will village of howellville get squeezed by development in tredyffrin?

Pattye Benson Community Matters Photo

Pattye Benson Community Matters Photo

The Village of Howellville is one of Tredyffrin’s earliest villages. So historic and it was easily accessible by the farms of the Great Valley.  According to Tredyffrin Easttown Historical Society it started with a tavern around 1712:

Howellville, one of Tredyffrin’s earliest villages, grew in an area convenient to the farms of the Great Valley. A tavern was often the start of a town, and the first one here was built about 1712. By the early 1700s, sawmills and gristmills had appeared. Nearest to the center of town was the sawmill on Crabby Creek. Several of the early farms had their own limestone kilns. The first school opened about 1720. A factory of some kind belonging to the Workizer family is listed on the 1798 Direct Tax. [Note 1] By the late 18th century, a shoemaker and a wheelwright had set up shop.

More industry developed in the 19th century, including a woolen mill owned by Samuel Wood. There was at least one blacksmith. By the middle of the century there was a store and the Chester Valley Railroad, and by the late 1800s Howellville was a thriving industrial town. The limestone quarries became big business and Italian immigrants arrived to work at them. Other nationalities followed, but were never as numerous or as prosperous as the Italians.

By the early part of the 20th century, Howellville had become a close-knit community-a bit naughty, with lots of drinking and gambling. Then came the Depression which dealt rather harshly with the village. Having lost their jobs, and with no place to go, the quarry workers lived hand-to-mouth. In 1934 Frances Ligget, later a member of the Tredyffrin Easttown History Club, marshalled the help of the Valley Forge Farm and Garden Club to clean up the town and help the unemployed workers and their families. Free seeds were given for gardens. The state provided medical assistance as well as sewing, knitting, and cooking classes, and a nursery school. Weaving was taught by Lettie Esherick, wife of the artist Wharton Esherick.

In 1681 land in the center of Tredyffrin Township that would eventually become most of Howellville belonged to William Mordaunt and John Hort Each owned 500 acres. They were Welsh Tract brokers-they bought the land from William Penn but never lived on it. In 1711 Mordaunt’s sons sold their 500 acres to John Evans, who had previously been Governor of Pennsylvania. Just to the east lay 1340 acres that David Meredith sold to William Powell in 1706. They were also Welsh Tract brokers.

Llewellyn David, a Welshman and one of the early settlers, bought 300 acres in 1708. The name David (later changed to Davis) was the biggest name in Howellville for the next two centuries.

The area sat at the bottom of a natural bowl where three hilly roads met to form a triangle. Swedesford Road, forming the north side of the triangle, came into existence about 1720, very early in the settlement of the Great Chester Valley. It led from the vicinity of Randall Malin’s house in East Whiteland to the Swede’s Ford at the Schuylkill River, near present day Norristown, and gave settlers in the interior access to Philadelphia.

Bear Hill Road, which formed the southeast side of the triangle, connected the Valley with the Black Bear Tavern at the top of the South Valley Hill near the Lancaster Road and today’s village of Paoli.

The southwest side of the triangle was Howellville Road, until a traffic light was installed at the corner about 1960. Then it became part of Swedesford Road and the north side of the triangle was made one-way. It was this way until most of Howellville’s buildings were torn down and Route 202 was completed and dedicated in 1971.

The triangle at the bottom of these roads was a convenient place for horses and wagons to stop and rest, and in 1745 a license was granted to establish the first tavern. When David Howell settled in the area and became the second innkeeper of the tavern, about 1765, it was called Howell’s Tavern. The village that grew up around it became Howellville. When the old inn was razed in 1921, the only house in the triangle was the little house described by Henry Darling later in this article.

The triangle disappeared in 1967 when Route 252 was widened and Route 202 was built.

READ THE ENTIRE HISTORY HERE

The history of Howellville is fascinating and rich.  Most people just think of Howellville Road today…not that it was a historically important crossroads village. It is an integral part of the history of Tredyffrin and was discussed in Tredyffrin’s 2009 Historic Preservation Plan.

001r

Last time I was on Howellville Road was in the fall  when I was noodling around and found myself on that road.  It has long fascinated me and I lament the loss of one crossroads village after the other as time progresses.

villa-straffordToday I just finished reading a blog post by my friend Pattye Benson about a proposed development there. Oh and the developer is a name familiar to East Whiteland and Radnor 6602889_0_jrbnqjresidents: Benson Companies. Or you know, the townhouses without real trees crammed in at 115 Strafford Ave in Wayne and the eqully unctious cram plan that finally got approved at 124 Bloomingdale Ave in Radnor. And for East Whiteland? Linden Hall. You know the developer that said they would restore historic Linden Hall if they got approved for townhouses, only they haven’t done anything other than sell approved 124-bloomingdaletownhouse plan  to Pulte who built the townhouses with a view of the cigar store, Route 30 and the still rotting Linden Hall? But is that all on Benson? What about the teaming up with O’Neill at super toxic Bishop Tube?  And do not forget Kimberton Meadows, right?27685291670_2d629ed33d_o

Anyway….Benson is once again the proposed townhouse gift that keeps on giving:

Community Matters: How many townhouses and assisted living communities does Tredyffrin Township need (or want)? Can the T/E School District accommodate the increase in student population?

You may recall the abandoned Jimmy Duffy property on Lancaster Avenue in Berwyn and the subsequent construction of Daylesford Crossing, an assisted living facility on the site.  The approval for Daylesford Crossing was a long, drawn out redevelopment process in 2012 that required a text amendment to permit senior living facilities as a by-right use in C-1 (commercial) zoning.

Some argued at the time that the zoning change to permit senior living in C-1 was ‘spot-zoning’ to accommodate this specific project and others questioned what this would mean for future C-1 development in Tredyffrin Township. In 2015, the township expanded the C-1 District zoning to also include townhouses as a by-right use.

During the last few years, developers have flocked to the township with their assisted living and townhouse, apartment and condominium plans. Assisted living projects currently under construction or in the review process include Erickson Living at Atwater Crossing in Malvern (250 beds) and Brightview Senior Living on E. Conestoga in Devon (196 beds).

On the townhouse-apartment side in the township, there are many projects in the planning stages or under construction….Areas that were once farmland continue to be developed.  Top ranking school district, T/E brings an influx of people to the area which means an influx of students, and the growing problem of finding a place to put them….. a new proposed land development plan in the works that is extremely troubling – townhouses on Howellville Road. The proposal is to wedge a cluster of 20 townhouses, in four buildings, between the village of Howellville and the shadow of the Refuge Pentecostal Church.

howellville-road-townhome-plans

….The proposed land development plan on Howellville Road is not compatible with the character and appearance of the area.  Beyond the impact of traffic on Howellville Road, the proposed development plan creates serious safety concerns.  The steep narrow winding nature of Howellville Road makes entry and exit from the proposed dense townhouse project a dangerous situation.

Benson Company’s proposed townhouse project on Howellville Road will change the look and character of this community as well as place a greater burden on the narrow, winding road – and again more students for the school district!

John Benson of Benson Company has enthusiastically offered that his proposed Howellville Road townhouses will look like his Grey’s Lane townhouses on Lancaster Ave.  A couple of things – (1) Grey’s Lane is on Rt. 30, a commercial 4-lane road vs. Howellville Road, a rural country road and (2) he squeezed 12 townhouses in at Grey’s Lane in 3 buildings where as this proposal is for 4 buildings with 20 townhouses….Areas that were once farmland continue to be developed. Between the assisted living communities and the townhouses and apartments, should the objective in Tredyffrin Township be to approve any and all land development projects regardless of the impact?

How awful this sounds and allow me to share two screen shots – one is Pattye’s photo of where the proposed townhouses will be stuffed in and perched like Jabba The Hut and all his children, and a rendering of the “Greys Lane” townhomes…another cram plan, and cheap looking to boot.

And from an aesthetic point of view, every time I see a staged interior of a “fabulous” Benson new construction piece of new construction dreck I am struck with the fact that every interior looks the same. If you want Barbie’s dream house, you are pretty much there. No character, predictable, mass produced, plastic.

Photo by Pattye Benson Community Matters

Photo by Pattye Benson Community Matters

25 Greys Lane, Berwyn, PA:

7db6d1b352d8413-6924697

YUCK!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Residents of Tredyffrin are soooo right!!  How much of this does any one township want or need? And much like neighboring East Whiteland it seems like people are hell bent on developing every square inch of the township! Who needs King of Prussia? Soon Tredyffrin and East Whiteland will definitely resemble King of Prussia meets Bensalem.

Oh yes, one more thing? Tredyffrin residents need to get to the Planning Commission TOMORROW February 16th when this next great godforsaken plan makes it’s debut along with “Westlakes Hotel” and “Chestnut Road Apartments”.

Again I ask where the hell the Chester County Planning Commission and Brian O’Leary are? Lord above, Chester County is drowning, yes drowning in development plans.

tredyffrin

toxic nightmare site bishop tube goes back to zoning…

This photo was taken in 2010, long before I lived in Chester County. It was taken by d.coleman in June of 2010. I found it on Flickr. This is a screen shot of photo with attribution and description as found in yellow. Photographers have been photographing Bishop Tube for years and I hear that high school kids find their way onto the site as well?

This photo was taken in 2010, long before I lived in Chester County. It was taken by d.coleman in June of 2010. I found it on Flickr. This is a screen shot of photo with attribution and description as found in yellow.  Photographers have been photographing Bishop Tube for years and I hear that high school kids find their way onto the site as well? I will note I have only ever taken photos from OUTSIDE the chain link fence.

Bishop Tube is a toxic site. It has been through remediation to a point, but I can’t find anything for 2015 in as far as a public accounting of where the clean-up is. Now maybe an update exists, but is it posted publicly anywhere that is easily accessible?  I am including a letter from Chester County Planning Commission from 2014 I do not think I shared before ( chester-county-planning-on-bishop-tube-march-2014 ).

Something that jumped out at me from said letter:

RECOMMENDATION:    While  the  County  Planning  Commission  supports  single-family  attached and multi-family residential development in the Suburban Landscape where infrastructure capacity can support such development, along with the implementation of adaptive reuse and infill strategies to redevelop abandoned industrial brownfield sites for moderate to high density multi- family housing designation, it does not appear that this location can support the density being proposed due to its existing physical and environmental characteristics.  Additionally, the amendment petition does not appear to be consistent with the Township’s Comprehensive Plan and its vision for Community Mixed Use.  The Commission recommends that East Whiteland Township deny the applicant’s zoning ordinance and zoning map amendment petition.

 

So that was 2014.  We are now in 2017.  East Whiteland has had Bishop Tube as a guest star topic at many meetings since then.  So truthfully, I don’t know which iteration of Constitution Drive Partners LP anyone is looking at.  Constitution Drive Partners = Brian O’Neill, remember?

Well, this plan is up in front of East Whiteland Zoning NEXT week January 23:

bishop-tube-zoningHERE in case you can’t see all of the fine print:

LEGAL NOTICES

NOTICE IS HEREBY GIVEN that the East Whiteland Township Zoning Hearing Board conduct a continued public hearing at 7:15 p.m. on Monday, January 23, 2017, at the East Whiteland Township Municipal Building, 209 Conestoga Road, Frazer, Pennsylvania, to consider Appeal No. 2016-24 Application of Constitution Drive Partners, L.P. and 9 Malin Road Development, LLC (collectively, “Applicant”) for a variance from Section 200-57.C.(6) of the East Whiteland Township Zoning Ordinance to permit single-family attached dwellings and townhouses in rows of more than six units, with associated driveways and grading to be located in both steep slope and very steep slope areas of the property formerly the site of the Bishop Tube complex (which is currently a brownfield site improved with dilapidated industrial buildings), located at 9 South Malin Road, 10 South Malin Road, and 1 South Malin Road (Tax Parcels 42-4-321, 42-4-321.1 and 42-4-321.2) (collectively, “Property”). The Property is located in an RRD (Residential Revitalization District) Zoning District. The public hearing was opened at the Zoning Hearing Board’s November 28, 2016 meeting. The Applicant has subsequently amended its Application to request a variance from Section 200-93.B of the Zoning Ordinance to permit the proposed retaining walls to exceed the permitted six (6) feet in height. On the above date, the Zoning Hearing Board will continue the public hearing and may render a decision on Appeal No. 2016-24. Anyone with a disability requiring a special accommodation to attend should notify Joseph T. Leis, Zoning Officer, at 610-648-0600 x 268. The Township will make every effort to provide a reasonable accommodation. Riley Riper Hollin & Colagreco Attorney for Constitution Drive Partners, L.P. DL-Jan 10, 16-1a

Steep slope and very steep slope.Still the key here. They want to increase site density if they want relief from steep and very steep slopes, right? How many hundred units do they want?  Last count was what, 264? And before that over 300?

Bishop Tube is what they call in crass terms a potential flipper baby site still, correct? Will super high amounts of residential density built on slabs with no basements solve all problems? Or is another use better for the site?

Forget about the problems with the site in the DEP and EPA categories and let us talk traffic, infrastructure, schools, basic township services.  Why does East Whiteland want to be King of Prussia or Bensalem? Is that what the majority of the residents want? Or do residents actually want thought and carefully planned growth versus one construction explosion after another?

How many 1000s of living units are planned, approved, or are in various stages of approval in East Whiteland at this point? That also affects neighboring municipalities and anyone in the Great Valley School District.

And do not forget this interesting developer O’Neill article from December:

Former O’Neill site on Rock Hill Road goes up for sale; was to be part of area’s transformation

Former O’Neill site for sale; was to be part of ‘gateway’ to Lower Merion By Richard Ilgenfritz rilgenfritz@21st-centurymedia.com @rpilgenfritz on Twitter Dec 2, 2016

Bala Cynwyd>> A long awaited building project that was supposed to be part of the transformation of an old rock quarry along Rock Hill Road in Bala Cynwyd has officially gone back on the market. Except for a groundbreaking and some preliminary work a couple of years ago, the approved project never moved forward.

 

The site was to become a mixed-use development proposed by Brian O’Neill, owner of O’Neill Properties.

Monday, Kevin Flynn Sr. of The Flynn Company confirmed that his company has the property at 131 Rock Hill Road up for sale.

According to Flynn, the 8.2-acre site was approved for four buildings of four-stories each with parking decks underneath. There would also be a surface lot and numerous other amenities.

 

O’Neill owned the site since 2004, when it was purchased for $3.5 million, according to online Montgomery County records. In 2014, the site was sold to an LLC called Alexander Street, for $11.122 million as the preliminary work was being done. They were to be the financing arm of the project.

 

Another site across the street on Rock Hill Road had also been owned by O’Neill and had been sold in 2010.

 

It’s not clear why O’Neill is apparently divesting himself in his holdings in that area. Calls to the company this week were not returned.

In Lower Merion Township people went through YEARS of awful meetings over steep slopes and a developer driven zoning overlay known as ROHO.  Has anyone asked Brian O’Leary of the Chester County Planning Commission about this as he would be very familiar with this plan given his time on Lower Merion Township’s Planning Commission?

I can’t see Bishop Tube from my window.  But if I could I sure as heck would turn up at this meeting.  Or if I lived at the edge of Malvern Borough where traffic here would become an issue. If I was a neighbor or affected by Bishop Tube, I would see that board room was packed.

Here are some of the old articles on Bishop Tube:

carribean blue in chesco?

14446065_1294020187277596_3538932532018469964_n

A view of the new construction on the quarry at Atwater recently. Somehow I don’t think just the fact limestone was quarried there makes that water that particular Caribbean blue in Chester County?

Also do not think this is what Enya meant either….

Sure makes you wonder….

In a similarly colored water area in England, the Daily Mail referred to that “disused quarry”  (also limestone) as “The Poison Blue Lagoon”

They call it the Blue Lagoon, and people come from far and wide to cool off in its clear waters.

Yet the flooded former quarry is so polluted that its contents are almost as toxic as bleach.

warning-1Signs close to the shoreline warn that not only is the water known to contain abandoned cars, dead animals and human waste, but it has a pH level of 11.3 – compared with 12.6 for bleach and 11.5 for ammonia.

They state how the water is toxic enough to cause ‘skin and eye irritations, stomach problems and fungal infections’.

warning-2

 

Ick ick ick….I wonder….Is it a similar situation at Atwater?  It is undoubtedly given the dirty toxic past of that area and surrounding area like Bishop Tube not just limestone sludge in that water and shouldn’t that be considered especially given the volume of development and density going in over there? After all, it’s not like there is substantial fencing separating the old quarry from new Tyvec wrapped plastic villages and what not over there are there? And wasn’t there a junk yard near by too?

Experts say quarries can be more dangerous than other bodies of water.  For all sorts of reasons.

It looks but is not quite Caribbean Blue. Just food for thought.  Who actually owns the quarry in East Whiteland you can see from Atwater, etc?

important bishop tube meeting december 9th in east whiteland

bishop tubeBishop Tube. East Whiteland’s TCE albatross own by the developer Brian O’Neill. It sits like a dangerous slumbering giant on the heels of General Warren Village in Malvern. (Please note the cool old General Warren photos a friend lent to me to use.)

At the November meeting of the East Whiteland Board of Supervisors(which was recorded!) Bishop Tube came up again.

The representative for Developer O’Neill regarding Bishop Tube Site (9 Malin Rd?) [ on tape 78:07 – 90:25] was there.  Anyway, there is a PUBLIC HEARING DECEMBER 9th in EAST WHITELAND (during Board of Supervisors Meeting) – Developer is looking for zoning relief. ( Malin Road Development Steep Slope Ordinance Amendment) Relief of steep slopes and this guy indicated that development CAN’T be built without it (what a pity that would be, right?)

general warren 1Anyway, the guy was sort of posturing in my humble opinion (it is what he is paid to do, right?) and there were sliding comments to the effect of East Whiteland wants the site cleaned up and they need this steep slope accommodation, do I have that right?  Well umm THEY SHOULD HAVE TO CLEAN UP BISHOP TUBE REGARDLESS, RIGHT???

Maybe I have listened to or attended too many O’Neill development meetings over the years but that sort of rubbed me the wrong way.

O’Neill will supposedly be at this public hearing. So listen up East Whiteland especially General Warren Village residents: if you worry about the site and the litigation over the TCE in the aquifer (i.e. chemicals leeching into ground and water), you need to attend this hearing. What was it someone said to me about Bishop Tube? That it was a potential flipper baby site? Crude and harsh but could be very true if not properly remediated, right? And how many residents of General Warren and former employees have died over the years from all sort of cancers? Is it all coincidence?

general warren 3East Whiteland doesn’t have to say yes and I have to tell you Supervisor Bill Holmes expressed concerns several times. Supervisor John Mott was unimpressive and the other guy (Wrably?) didn’t open his mouth and sat there pretty much mute. Many thanks to Bill Holmes for getting it on this issue. I know I have been tough on Bill in the past, but I have to say I have taken the time to start to get to know him and he is a good guy.

BUT you can’t enact change or be heard on the record if you do not attend the hearing.

Again, as of now it is December 9th during next Board of Supervisors Meeting . You can listen to the back and forth on this recording at 78:07 – 90:25 .

I have been told about treatment some General Warren residents have received over the years for speaking out about things affecting them, and shall we say what I heard made me wince? And no, I am not recounting exactly what I have been told because I did not witness it, but I believe what I heard.

general warren villageFor anyone living in General Warren Village they have posted a zoning notice at the entrance of the Bishop Tube site regarding the steep slope protection. There will be a meeting on Wed, December 9th at 7:00PM at the East Whiteland Township building.  No one can make you go, but suffice it to say you guys are the most directly affected and have the best standing. Although truthfully every resident and taxpayer in East Whiteland has standing. Standing means you have the right to be heard.

I am praying for a Christmas miracle. I am praying East Whiteland residents pack and rock this meeting December 9th.

And oh yes, that lawsuit in Federal Court over Bishop Tube? VERY ACTIVE.

United States District Court Eastern District of Pennsylvania (Philadelphia)

CIVIL DOCKET FOR CASE #: 2:15cv01919GJP
WARREN et al v. JOHNSON MATTHEY, INC. et al
Assigned to: HONORABLE GERALD J. PAPPERT

Cause: 42:6972(a) Solid Waste Disposal Act

URS B. FURRER
HARRITON & FURRER, LLP
84 BUSINESS PARK DR #302
ARMONK, NY 10504
9147303400
Email: ubfurrer@hflawllp.com

Defendant

CENTRAL AND WESTERN
CHESTER COUNTY INDUSTRIAL
DEVELOPMENT AUTHORITY
represented by ALAN PAUL NOVAK
LAMB MCERLANE PC
POBOX 565
24 EAST MARKET ST
WEST CHESTER, PA 19381
6104308000

Email: anovak@lambmcerlane.com
ATTORNEY TO BE NOTICED

HELEN J. ESBENSHADE
LAMB MCERLANE PC
24 E MARKET ST
WEST CHESTER, PA 19381
6104308000
Email: hesbenshade@lambmcerlane.com

ATTORNEY TO BE NOTICED

SARAH DAMIANI
CONRAD O’BRIEN
1500 MARKET ST
PHILADELPHIA, PA 19102
2158648069
Email: sdamiani@conradobrien.com

ATTORNEY TO BE NOTICED

Defendant

CONSTITUTION DRIVE
PARTNERS, L.P. (AKA O’NEILL DEVELOPMENT YES?)
represented by GARRETT DOUGLAS TREGO
MANKO GOLD KATCHER & FOX
LLP
401 CITY AVENUE SUITE 901
BALA CYNWYD, PA 19004
4844305700
Fax: 4844305711
Email: gtrego@mankogold.com

ATTORNEY TO BE NOTICED

SUZANNE ILENE SCHILLER
MANKO, GOLD, KATCHER & FOX,
LLP.
401 CITY AVENUE
SUITE 901
BALA CYNWYD, PA 19004
(610) 6605700
Fax: 4844305711
Email: sschiller@mankogold.com

ATTORNEY TO BE NOTICED

Defendant